How to Compare Contractor Quotes (and Spot Red Flags)

The lowest number is not always the lowest price. The trick is making sure you are comparing the same project.

Project manager reviewing plans on a framed job site
Project manager reviewing plans on a framed job site

Collecting a few quotes is smart. Comparing them can be confusing, because contractors describe work in different ways. Here is how to put quotes side by side fairly.

1. Check that the scope matches

Read each quote line by line. Does each one include demolition, disposal, materials, permits and final cleanup? One quote may look cheaper simply because it leaves something out.

2. Compare materials, not just prices

"Tile shower" can mean very different things. Look for specifics: the type of tile, the waterproofing method, the cabinet construction, the roofing product. If a quote is vague, ask for details.

3. Look at allowances

If one quote includes a small allowance for fixtures and another includes a larger one, the totals are not directly comparable. Our post on setting a realistic renovation budget explains how allowances work.

4. Ask about the timeline

When can work begin, and how long will it take? A very fast timeline is not always better if it depends on skipping steps such as curing time or inspections.

5. Review the payment schedule

A reasonable payment schedule is tied to progress. Be cautious with any request for most of the money before work has begun.

6. Confirm permits and inspections are included

Ask who is responsible for pulling permits and scheduling inspections. See renovation permits in New Jersey.

Red flags worth noticing

  • Pressure to sign immediately, or a price that is only good today.
  • No written contract, or a contract with almost no detail.
  • Reluctance to share a registration number or proof of insurance.
  • Suggestions to skip permits to save money.
  • A price far below every other quote, with no clear explanation.
  • Payment requested only in cash.

Build a simple comparison sheet

Quotes arrive in different formats, so it helps to translate them into one. Make a short table with a row for each major part of the project and a column for each contractor. Typical rows include demolition and disposal, framing and structural work, plumbing, electrical, drywall and paint, flooring, cabinets and counters, fixtures, permits and cleanup. When a cell is empty, that is a question to ask, not a saving.

Ask each contractor to walk you through their number

A quote is easier to understand when you hear the reasoning behind it. Ask each contractor what they think is the most challenging part of your project and how they plan to handle it. Ask what they assumed about the parts of the house they could not see. The answers reveal who has thought carefully about your home and who has priced a generic version of the job.

Watch for exclusions

Many estimates include a short list of things that are not covered. Read it closely. Common exclusions include repairs to damage found behind walls, upgrades needed to bring older systems up to code, patching and painting outside the work area, and appliance installation. None of these are unusual to exclude, but you need to know about them to compare fairly and to plan your contingency.

Compare the people, not just the paper

Two quotes can be nearly identical and still lead to very different experiences. Consider how quickly each company responded, whether your questions were answered clearly and whether the estimate was explained or simply emailed. Ask who will supervise the job day to day and how often you will hear from them. Those details shape the months you will spend working together.

Ask for clarification in writing

When something in a quote is unclear, ask the contractor to update the document rather than relying on a verbal answer. A revised quote that spells out the scope protects both of you and becomes the basis for a clear contract.

Check references and recent work

Once the quotes are lined up, look beyond the numbers. Ask each contractor for photos of recent projects similar to yours, and read their reviews on more than one site. Pay attention to how they respond to the occasional less-than-perfect review; a calm, helpful reply says a lot. If possible, ask for references from homeowners whose projects were finished in the last year or two, and ask those homeowners whether the job stayed on schedule, how surprises were handled and whether they would hire the company again. You can see examples of our finished projects on Our Work.

Green flags

  • A detailed, written scope.
  • Clear answers to your questions, and questions back to you about your goals.
  • Photos of similar completed work.
  • A clear process for handling changes.

For a full checklist, read our questions to ask before hiring a contractor. When you are ready, request a quote for your project. Our general contracting and design-build teams put every detail in writing.

Talk to KAS about your project

KAS Home Improvement is a veteran-owned home renovation and general contracting company in Dunellen, New Jersey. Tell us what you have in mind and choose a time that suits you.

Request a free quote (732) 522-0257

Next steps

Ready to start your project?

Choose the next step that works for you. Every project starts with a conversation about your goals, your space and your budget.